Pilings construction in coastal North Carolina

PILINGS

Piling Driving and Replacement on the Coast

Pressure-treated and CCA pilings driven to refusal — for new docks, pier rebuilds, and bulkhead repair.

Driven to RefusalCCA & PT AvailableBarge-Mounted Driver

THE CHALLENGE

Why this matters on coastal NC

A piling that stops short does not hold a pier or a bulkhead. Refusal is the only spec we drive to.

MATERIALS WE USE

Pressure-treated 8x8, 10x10, 12x12 pilingsCCA-treated marine pilings (available)Stainless or galvanized piling capsHot-dipped galvanized strapsMarine sealant on cut tops

WHAT'S INCLUDED

Every pilings build covers

  • Bottom probe and refusal estimate before quoting
  • 8x8, 10x10, or 12x12 pressure-treated pilings
  • Marine-rated CCA treatment available
  • Barge-mounted hydraulic pile driver
  • Cut-off, cap, and clean-up included

HOW WE BUILD PILINGS

Our 5-step process

01

Free Site Evaluation

We probe the bottom and confirm refusal depth before quoting.

02

Material Order

Pilings are delivered direct from the treatment yard, never stockpiled.

03

Drive

Our barge-mounted hydraulic driver sets each piling to refusal — no shortcuts.

04

Cut & Cap

We cut every piling square at finish elevation and apply a piling cap if specified.

05

Walkthrough

You get a written record of every piling location, depth, and refusal blow count.

PRICING & TIMELINE

Free Site Evaluation

Free site evaluation. Most piling jobs fall in the $300 – $900 per piling range installed, depending on size and access.

Request estimate

WARRANTY

One-Year Workmanship

One-year workmanship warranty. Pilings carry their treatment warranty (typically 25 years).

Materials carry their respective manufacturer warranties.

WHAT HOMEOWNERS SAY

Real feedback on our pilings

“He drove every piling to refusal. The old builder stopped at twelve feet and called it done — those pilings shifted in two years.”

Homeowner

Sneads Ferry · Pilings

“The barge crew was in and out in a day. Every piling is straight and capped.”

Homeowner

Wilmington, NC · Pilings

[Placeholder — authentic Google reviews will replace these once provided.]

OUR APPROACH

The Blow-Count Verification Record

We log every piling's location, depth, and final blow count on a written record you keep. If a future contractor claims your pilings are short, you have the proof in hand.

— Mark Lipe, NC GC #100980

FROM MARK LIPE

Pilings done right is invisible — it just works through the next storm and the next ten tides. That's the standard.

— Mark Lipe

FAQ

Questions about pilings

>

What size piling do I need?

Light residential docks use 8x8. T-head piers and lift pilings usually need 10x10. Bulkheads and commercial docks step up to 12x12.
>

PT or CCA?

PT (pressure-treated) is the standard. CCA is the older marine-grade treatment and lasts longer in salt water but is special order.
>

How do you reach the site?

We barge in the driver for water-only sites or truck it in if there is a launch within reach.

Talk to us about pilings

Free site evaluation. Written estimate within one business day. Every board, fastener, and piling listed.